ECS SDPS Release 6A
Consent-to-Ship Review
April 17, 2001


Updated Slides

The following file contains corrected/updated slides. The slides that have been updated are pages: 18, 19, 43, 83.

PDF (123.27 KB)


Presentation

Introduction and Agenda - V. Maclin
6A System Functionality - E. Nakamura
Release 6A Test Status - J. Rubenacker
Performance Verification Lab - S. Linehan
Non-Conformance Report (NCR) Status - J. Cockey
Post-CSR Installation & Transition - R. Nirgudkar
ECS Support to Site Readiness - L. Head
CDRL Documentation Summary - J. Spyrison
Functional Configuration Audit - J. Spyrison
Physical Configuration Audit - S. Haupt
Liens Against 6A at CSR - V. Maclin
Concluding Remarks - V. Maclin

File: PDF (429.46 KB)


Back to Home  _____________________________________  Quick Search