This document, Release 6B Mission Operation Procedures for the ECS Project, provides
DAAC procedures that assign and describe operators, engineers, operations support,
administration and management staff actions required to configure, maintain and operate
the ECS applications at Release 6B maturity. The DAAC portion of this document
contains system-level standard procedures that can be modified at the DAACs during
subsequent training, operations exercises and procedure review activities to reflect
desired uniqueness. The objectives of Release 6B system are to provide capability to
support the ingest and archive of raw data obtained from instruments on Earth Observing
System (EOS) satellites [e.g., the EOS AM Mission spacecraft 1, morning equator
crossing spacecraft series (Terra (AM-1)), EOS PM Mission spacecraft 1, afternoon
equator crossing spacecraft series (Aqua (PM-1)) and the Land Remote-Sensing Satellite
(Landsat 7)]. Other capabilities provided by Release 6B include processing the data
obtained, distributing raw or processed data as requested, quality assurance of processed
data, supporting communication networks, and systems monitoring via interfaces with the
ECS operations staff. (jp)
Due to file size, this document has been broken into multiple files. A complete file listing for the Release 6B Mission Operation Procedures is available via this link.
Supersedes 611-CD-610-001